Skip to product information
1 of 9

Vesgantti

Vesgantti 88.4" Sectional Sleeper Sofa with Pull Out Bed, 5 Seater L Shaped Modular Sectional Couch with Storage, Comfy Corduroy Modular Couch for Living Room, Bedroom, Apartment, Black

Vesgantti 88.4" Sectional Sleeper Sofa with Pull Out Bed, 5 Seater L Shaped Modular Sectional Couch with Storage, Comfy Corduroy Modular Couch for Living Room, Bedroom, Apartment, Black

Regular price $1,439.98 USD
Regular price Sale price $1,439.98 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • Convenient Pull Out Sofa Bed: This 5 seater modular sofa effortlessly converts into a spacious sleeper sofa bed througout pull-out drawstring, providing a comfortable sleeping space for family movie nights, naps, or overnight guests. The pull out bed module allows seamless conversion between a sectional couch and sleeper sofa, enhancing flexibility to fit your space perfectly
  • Modular Sectional Sofa with Storage: This L shaped modular couch is equipped with storage space at the bottom and side of the sofa for you to organize your space. You can store blankets, pillows, toys, daily necessities in a hidden place to save space and keep the space tidy. The sectional couch with pull out bed is a ideal choice for living room, bedroom, office and apartment
  • Premium Corduroy Fabric: Our sectional sofa features pet friendly corduroy fabric which offers a soft & warm touch. This sleeper couch is designed with thick high resilience foam backrests & cushions for ultimate relaxation and comfortable seating experience. We have a variety of colors and sizes for option to meet different decoration styles (Note: Colors may vary slightly due to lighting or monitor settings)
  • Stable and Durable Structure: This sectional couch with pull out bed is designed with a sturdy wooden frame and is easy to pull out as sleeper sofa bed for daily use. The frames (armrests, backrests, seat frames) of sectional modular couches are made of FSC-certified wood, making them more stable, durable and load-bearing than other products.
  • Easily Assemble: This sleeper couch is easy to be assembled by 2 persons, following the detail instructions step by step. The sectional sofa bed is delivered in 4 boxes, which may arrive on different days. Before assembling, please check all parts. If you have any questions or are dissatisfied with our sleeper sofa, please contact us immediately.

Overview

  • Brand : Vesgantti
  • Assembly Required : Yes
  • Weight Limit : 1750 Pounds
  • Product Dimensions : 88"D x 88.4"W x 35.8"H
  • Item Weight : 97 Pounds
  • Type : Sofa Bed
  • Color : Black-plush Corduroy
  • Special Feature : Storage
  • Room Type : Bedroom, Living Room
  • Arm Style : Track
  • Seating Capacity 5.00 : Style Modern
  • : Seating Capacity 5.00
  • : Style Modern
  • Shape L-Shape : Frame Material Wood
  • : Shape L-Shape
  • : Frame Material Wood
View full details