Skip to product information
1 of 9

Vesgantti

Vesgantti 113.6" Modular Sectional Sofa with Pull Out Couch Bed, 7 Seater U Shaped Sleeper Sofa with Storage Chaise, Corduroy Sectional Couch for Living Room, Bedroom, Apartment, Black

Vesgantti 113.6" Modular Sectional Sofa with Pull Out Couch Bed, 7 Seater U Shaped Sleeper Sofa with Storage Chaise, Corduroy Sectional Couch for Living Room, Bedroom, Apartment, Black

Regular price $2,159.98 USD
Regular price Sale price $2,159.98 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • Convenient Pull Out Sofa Bed: This 7 seater modular couch effortlessly converts into a spacious sleeper sofa bed througout pull-out drawstring, providing a comfortable sleeping space for family movie nights, naps, or overnight guests. The pull out bed module allows seamless conversion between a sectional couch and sleeper sofa, enhancing flexibility to fit your space perfectly
  • Sectional Couch with Storage Chaise: This U shaped modular sectional sofa is equipped with storage space at the bottom and side of the sofa for you to organize your space. You can store blankets, pillows, toys, your daily necessities in a hidden place to save space and keep the space neat and tidy. The modular couch with pull out bed is a ideal choice for living room, bedroom, office and apartment
  • Premium Corduroy Fabric: Our sectional couch features pet friendly corduroy fabric which offers a soft & warm touch. This sleeper sofa bed is designed with thick high resilience foam backrests & cushions for ultimate relaxation and comfortable seating experience. We have a variety of colors and sizes for option to meet different decoration styles (Note: Colors may vary slightly due to lighting or monitor settings)
  • Stable and Durable Structure: This sectional sofa with pull out bed is designed with a sturdy wooden frame and is easy to pull out as sleeper sofa bed for daily use. The frames (armrests, backrests, seat frames) of modular sectional couches are made of FSC-certified wood, making them more stable, durable and load-bearing than other products.
  • Easily Assemble: This pull out bed couch is easy to be assembled by 2 persons, following the detail instructions step by step. The sectional sofa bed is delivered in 4 boxes, which may arrive on different days. Before assembling, please check all parts. If you have any questions or are dissatisfied with our sleeper couch, please contact us immediately.

Overview

  • Brand : Vesgantti
  • Assembly Required : Yes
  • Weight Limit : 2250 Pounds
  • Product Dimensions : 88"D x 113.6"W x 35.8"H
  • Item Weight : 96 Pounds
  • Type : Sofa Bed
  • Color : Black-plush Corduroy
  • Special Feature : Storage
  • Upholstery Fabric Type : Corduroy
  • Room Type : Bedroom, Living Room
  • Seating Capacity 7.00 : Style Modern
  • : Seating Capacity 7.00
  • : Style Modern
  • Shape Rectangular : Frame Material Wood
  • : Shape Rectangular
  • : Frame Material Wood
View full details